It's been awhile since I updated the progress we are making in the bathroom..(maybe I should rephrase,) the progress John is making in the bathroom. He's pretty much done it all, thanks babe!
The walls are now, 'liveable green" from sherman williams. It's a bit scary going from the dark brown walls, which I liked to the light, bright bathroom. I was ready to say goodbye though to the brown, which was here when we moved in & the same color as our bedroom. It feels good to have picked the color even though it's still growing on me. John says, "it's here to stay," so I'm optimistic that when it all comes together, it'll feel complete when the green.
The faucets came yesteday..I dont have pictures of those, they are still in the box. But hoping to be able to brush my teeth in my own bathroom this weekend. We are still deciding on the faucets for the tub & shower. The shower door had to be special order, so it'll be 2011 before it's installed & ready to be tested out:) & the hardware is here, but still be put on the cabinet doors.
So mostly the new completed updates are the walls, counter, sinks (kinda) & tile. We both love the tile & John did an awesome job with all the geometry involved. I'm glad we went with the border that matched the floor vs. the backsplash border we picked. We orginally thought about putting the small tile all the way around as the border.
I'm excited & antsy to have come this far with another home improvement project. Hopefully the next post on the bath will show it all done!